Mochovce nuclear power plant (unit 1-2)
The works were performed both in the nuclear and conventional islands and included performance of maintenance during regular planned outages.
Works at maintenance of technologies, piping systems, valves, seismic reinforcement of technologies, welding of steam generator pressure parts including heterogenous joints, as well as welding works at replacement of a high pressure turbine component and replacement of tubes in the turbine generator main condenser.